15 public works projects registered with the California Department of Industrial Relations, 2012–2022 · Ventura.

Projects by year

YearProjectsReported contract value
20221—
20141—
20139—
20124—

DIR has published contract amounts since July 2024; earlier years count projects only.

Types of work

  • Storm drain & flood control · 5
  • Concrete & masonry · 4
  • Other · 3
  • Bridges & structures · 1
  • Paving & streets · 1
  • Demolition & site work · 1

Inferred by Atriam from each project's name and description, not reported by the agency.

Latest projects

DateProjectPrime contractorContract amount
May 12, 2022Live Oak Acres Levee Final DesignStorm drain & flood control——
Apr 15, 2014Somis Drain Channel RepairsConcrete & masonry——
Dec 5, 2013Oxnard West Vertical WallOther——
Sep 3, 2013San Antonio Creek Spreading Grounds RehaConcrete & masonry——
Jul 23, 2013Arundell Barranca Channel Repairs UPRR tOther——
Jul 23, 2013J Street Drian Ormond Beach Lagoon to DoPaving & streets——
Jul 23, 2013Zones 1, 2 & 3 Pipe Infiltration RepaoriConcrete & masonry——
Jul 17, 2013Heyn DemolitionDemolition & site work——
Jun 4, 2013Camarillo Hills Drain Invert RestorationOther——
Jun 4, 2013Installation of Full Capture Catch BasinStorm drain & flood control——
Apr 8, 2013Zone 3 Corrugated Metal Pipe Repairs 201Storm drain & flood control——
Oct 23, 2012Beardsley Channel Pier Wall Repair at HwBridges & structures——
Jul 24, 2012Barlow Barranca 2012 Channel RepairsConcrete & masonry——
Jul 17, 2012Barlow & Arundell Barrancas Culvert ConcStorm drain & flood control——
May 21, 2012Camarillo Hills Drain Lantana St. to CarStorm drain & flood control——

Source: California Department of Industrial Relations public works project registrations (PWC-100), updated daily by Atriam.