Rancho California Water District

590 public works projects registered with the California Department of Industrial Relations, 2002–2026 · Temecula, Riverside County. Reported contract value: $54,052,657.

Projects by year

YearProjectsReported contract value
20263$325,925
20253$2,455,371
202421$51,271,361
202322—
202229—
202124—
202054—
2019171—
2018132—
201780—
201617—
201513—
20146—
20101—
20021—

DIR has published contract amounts since July 2024; earlier years count projects only.

Types of work

  • Paving & streets · 261
  • Water · 145
  • Other · 108
  • Parks, landscape & fields · 16
  • Sewer & wastewater · 13
  • HVAC & mechanical · 12
  • Electrical, low voltage & AV · 11
  • Demolition & site work · 5
  • Concrete & masonry · 5
  • Buildings & facilities · 4
  • Solar, EV & energy · 3
  • Design, inspection & consulting · 2

Inferred by Atriam from each project's name and description, not reported by the agency.

Contractors it awards most

Prime contractorProjectsReported contract value
NOR-CAL PUMP & WELL DRILLING, INC.3$2,849,000
PACIFIC HYDROTECH CORPORATION1$30,761,600
HPS MECHANICAL INC.1$2,315,391
WEST YOST ASSOCIATES, INC1$261,836
LAYFIELD USA CORPORATION1$90,000
HOUSTON & HARRIS P C S INC1$53,461
Hoch Consulting, Inc1$49,980
DOWNSTREAM SERVICES INC1$10,628

Latest projects

DateProjectPrime contractorContract amount
Mar 24, 2026Vail Ranch Pressure Reducing StationsOtherWEST YOST ASSOCIATES, INC$261,836
Mar 16, 2026Vail/Pauba Ranch Drain Line CCTV InspectStorm drain & flood controlDOWNSTREAM SERVICES INC$10,628
Feb 5, 2026Fiscal Year 2025/2026 Sewer Video SurveySewer & wastewaterHOUSTON & HARRIS P C S INC$53,461
Nov 13, 2025JOAQUIN RANCH PUMP STATION DISINFECTIONWaterHPS MECHANICAL INC.$2,315,391
Oct 15, 2025Old Town Front St Pipeline ReplacementPaving & streetsHoch Consulting, Inc$49,980
Jan 16, 2025RECYCLED WATER POND 1/2 LINER REPAIRWaterLAYFIELD USA CORPORATION$90,000
Dec 12, 2024D2121 DRILLING WELL NO. 175WaterNOR-CAL PUMP & WELL DRILLING, INC.$894,520
Dec 12, 2024D2009 DRILLING WELL NO. 173WaterNOR-CAL PUMP & WELL DRILLING, INC.$1,083,696
Dec 12, 2024D2058 DRILLING WELL NO. 174WaterNOR-CAL PUMP & WELL DRILLING, INC.$870,785
Dec 12, 2024D2058 EQUIPPING WELL NO. 174Water—$2,158,000
Dec 12, 2024D2009 EQUIPPING WELL NO. 173Water—$1,945,000
Dec 12, 2024D2121 EQUIPPING WELL NO. 175Water—$1,668,000
Oct 17, 2024CARANCHO PUMP STATION EXPANSION AND IMPWater—$6,711,861
Oct 17, 2024UVDC IN-LINE TURBINE GENERATOR HYDROELECElectrical, low voltage & AV—$3,911,300
Oct 17, 2024WASHINGTON AVE IN-LINE TURBINE GENERATORElectrical, low voltage & AV—$1,266,600
Jul 11, 2024UVDC Pump Station and Contact TankWaterPACIFIC HYDROTECH CORPORATION$30,761,600
May 29, 2024NEW PAD FOR FUTURE WELL NO. 173Water——
May 29, 2024UVDC WELL NO. 175 GRADED PAD AND DISCHARWater——
May 24, 2024Weed Abatement Upper VDCDemolition & site work——
May 24, 2024Weed Abatement Upper VDCDemolition & site work——
May 24, 2024Solar Facility Annual PM and MaintenanceSolar, EV & energy——
May 15, 2024Bathroom RestorationOther——
Apr 20, 2024Equipping New Well No. 172Water——
Apr 8, 2024Concrete Pad at De Portola Storage BuildConcrete & masonry——
Apr 1, 2024RCWD 2024 Sewer Main CleaningSewer & wastewater——

Source: California Department of Industrial Relations public works project registrations (PWC-100), updated daily by Atriam.