City of Stockton Municipal Utilities Department

130 public works projects registered with the California Department of Industrial Relations, 2000–2026 · Stockton, San Joaquin County. Reported contract value: $12,013,604.

Projects by year

YearProjectsReported contract value
202611$1,417,967
202515$1,954,506
202416$6,886,131
20239—
20224$1,755,000
20219—
202013—
201911—
20187—
201715—
201615—
20154—
20001—

DIR has published contract amounts since July 2024; earlier years count projects only.

Types of work

  • Other · 38
  • Sewer & wastewater · 29
  • Water · 21
  • Storm drain & flood control · 19
  • Buildings & facilities · 5
  • Paving & streets · 5
  • Electrical, low voltage & AV · 4
  • Concrete & masonry · 3
  • Demolition & site work · 2
  • Parks, landscape & fields · 2
  • Bridges & structures · 1
  • HVAC & mechanical · 1

Inferred by Atriam from each project's name and description, not reported by the agency.

Contractors it awards most

Prime contractorProjectsReported contract value
POWER ENGINEERING CONSTRUCTION COMPANY4$235,382
Bockmon & Woody Electric Co.3$845,164
Clear Creek Systems, Inc.2$159,710
BAILEY FENCE COMPANY INC2$124,975
NEVADA BADGER DAYLIGHTING CORP1$3,311,000
SYNAGRO-WWT, INC1$1,755,000
CON J FRANKE ELECTRIC INC1$247,700
WEST VALLEY CONSTRUCTION1$144,130
ACE-HIGH ENGINEERING1$85,689
MICHAEL C. HARLAN1$82,425
LIND MARINE LLC1$78,588
T & S WEST1$69,962
NOR - CAL PIPELINE SERVICES1$44,970
HAGGERTY1$34,440
JDW WELDING LLC1—

Latest projects

DateProjectPrime contractorContract amount
Sep 23, 2026RWCF Stores Racking & Shelving InstallatSewer & wastewaterPCG ENGINEERING$60,000
Aug 20, 2026Smith Canal PS Odor Control MediaSewer & wastewaterClear Creek Systems, Inc.$99,960
Aug 17, 202614-Mile Slough Pump Station Discharge MoWaterACE-HIGH ENGINEERING$85,689
Aug 1, 2026Alexandria & 14 Mile Storm Pump StationSewer & wastewaterBockmon & Woody Electric Co.$381,497
Jul 23, 2026Brookside PS Odor Control RehabWaterClear Creek Systems, Inc.$59,750
Jul 14, 202660" Pipeline Dive InspectionOtherPOWER ENGINEERING CONSTRUCTION COMPANY$42,124
Jun 17, 2026Perimeter Weed ControlOtherMICHAEL C. HARLAN$82,425
Jun 3, 2026RWCF Buildings 90 & 93 Exterior Doors InElectrical, low voltage & AVT & S WEST$69,962
Mar 3, 2026Sanitary Sewer Large Diameter Sewer LineSewer & wastewaterLAMASSU UTILITY SERVICES INC$414,903
Mar 1, 2026NaspafOther—$30,430
Mar 1, 202614 Mile Slough PS Carbon Adsorber ReplacOtherDIEDE CONSTRUCTION INC$91,227
Dec 11, 2025Airport Way CCTVSewer & wastewaterNOR - CAL PIPELINE SERVICES$44,970
Oct 2, 2025Ferrous Chloride Tank ModificationConcrete & masonry—$28,350
Oct 1, 2025Grupe (Honda) Service Platform RepairsOtherHAGGERTY$34,440
Sep 24, 2025RWCF Oxidation Ponds Erosion RepairsOtherBAILEY FENCE COMPANY INC$24,975
Sep 23, 2025Alexandria & 14-Mile Storm Pump StationStorm drain & flood controlBockmon & Woody Electric Co.$381,497
Aug 26, 2025Cedar Ridge Water Service Lateral ReplacWaterWEST VALLEY CONSTRUCTION$144,130
Aug 14, 2025Discharge Pipe ReplacementStorm drain & flood control—$26,825
Aug 6, 2025MUD RWCF BLDG 90 & 93 BlindsBuildings & facilitiesELITE SHUTTERS AND SHADINGS INC$32,104
Jul 29, 2025RWCF Headworks CDF FillBuildings & facilities—$45,135
Jul 28, 2025Oxidation Ponds Ditch #2 Powerline RelocSewer & wastewaterBockmon & Woody Electric Co.$82,170
Jun 18, 2025Stockton Channel Bubbler SystemOtherPOWER ENGINEERING CONSTRUCTION COMPANY$60,678
Jun 18, 2025Stockton Channel Bubbler SystemOtherPOWER ENGINEERING CONSTRUCTION COMPANY$60,678
Jun 3, 2025Wilson Way Undercrossing Pump StationSewer & wastewaterCON J FRANKE ELECTRIC INC$247,700
Apr 1, 2025RWCF South Bioscrubber RepairsSewer & wastewaterTNT INDUSTRIAL CONTRACTORS INC$646,927

Source: California Department of Industrial Relations public works project registrations (PWC-100), updated daily by Atriam.